
Leisure Pools Fiberglass
Plunge pools up to 35 foot shells
Best for: less brushing and a sooner first swim
Starts at$40,622or about $450 a month*
See More Fiberglass PoolsThe Quiet End of a Long Day Starts in Your Own Backyard.
Kids worn out from swimming, dinner done, and your feet in cool water. Jason helps you choose between fiberglass, gunite, and semi-inground for your lot.
Pools in Bixby start at $19,999 for the OK Plunge, a semi-inground vinyl liner pool sold as the pool only. Leisure Pools fiberglass starts at $40,622. Custom gunite starts at $55,000 for a plunge and $100,000 for full size. Every pool type adds electrical, dirt hauling, and the permit fee. Fiberglass adds a crane only when the shell cannot reach your yard by truck.
You want a place to unwind without packing the car. What holds you back is the worry that the build itself becomes one more thing to manage.
Bixby zoning keeps pools in the rear yard, and its permit office checks easements. A careless layout gets sent back and costs weeks.
Some quotes leave out electrical, hauling, or the permit fee. Those bills show up later, after the dirt is already moving.
Fill and a retaining wall on a sloped lot can run $10,000 to $15,000. A bid written for a flat yard hides that cost.
You already work hard enough. Your pool should be the one part of the week that asks nothing of you.
Most parents have no time to chase a contractor. Jason has 29 years of pool builds in Oklahoma clay and rock. He measures your yard in person, draws your pool in 3D, and answers your calls from day one.
You see every included item, and every extra, before the first shovel. Your signed price does not move, unless we hit buried rock.
Weather and permit delays may push the date back. They never raise your contract price.
“If your yard is not right for a pool, I would rather tell you that on the site visit than take your deposit and figure it out later.”
JasonHe phones ahead to pick a time, since we never arrive unannounced. The visit runs about an hour, and your written yard notes follow within a day.
We draw the pool in 3D, place it where Bixby zoning allows, and write your quote. The design fee counts toward your build.
Plan on about 26 working days for vinyl liner, 4 to 6 weeks for fiberglass, and 3 to 6 months for gunite. Pool school wraps it up.
These are true starting prices. Your own number comes in writing, before any digging.

Plunge pools up to 35 foot shells
Best for: less brushing and a sooner first swim
Starts at$40,622or about $450 a month*
See More Fiberglass Pools
Full-size builds start at $100,000
Best for: a one-off shape, depth, or edge
Plunge starts at$55,000or about $542 a month*
Check My Yard
A 10 by 20 pool, 4 to 6 feet deep
Best for: getting started now and adding later
Starts at$19,999or about $197 a month*
OK Plunge PackageWe name these extras now so nothing surprises you later. We add no markup to any of them.
*Monthly payments are examples, not loan offers. They assume the full starting price is financed with no down payment, a fixed 8.5% APR, and 180 equal monthly payments over 15 years. Example: a $40,622 Fiji Plunge is 180 payments of $450.05, with $35,307 in total interest. The 8.5% APR is what VistaFi reported for strong credit, near 800, in October 2026. Your APR, term, and approval depend on your credit, income, and debts. VistaFi Solutions is not a lender (NMLS ID 2538400). Silverado Rock is not a lender and does not make credit decisions.
Leave your name and number. Jason will phone to find a visit time that fits your week.
Want a rough number for your own yard first? Try our cost calculator.
The deck hides most of a pool for good. These are the steps we take below ground, on every single build.
Fiberglass shells sit on 4 or more inches of packed 3/8 inch chip stone. The same stone fills in around the shell and lets water drain.
Each plumbing line gets a pressure test before the backfill goes in. Any leak shows up while the trench is still open.
A capped pipe sits in the stone at the deep end of each inground pool. After a big storm, a pump can drop in and draw the water off.
Gunite builds get an 8 inch shell over steel. For the first week, the crew wets it three to five times a day while it cures.
We look over every fiberglass shell when it arrives. One with shipping damage goes back on the truck and never into your yard.
Every job starts with an OKIE811 request, so gas, water, and cable lines get marked before we dig.

We build fiberglass, gunite, and semi-inground pools, so the right answer is whatever fits you. Start with the card that sounds most like your family.
A smooth Leisure Pools shell with a tiled waterline goes in over 4 to 6 weeks, set on packed stone.
Gunite bends to any shape or depth your lot allows. Expect 3 to 6 months for a custom build.
Part of the pool rises above grade, and the rest sits 18 inches or more into the ground. Rock or brick faces the raised wall.
The OK Plunge is $19,999 for the pool alone. Decking, rock, and features can come in a later season.
Silverado Rock is a pool builder in Tulsa, Oklahoma, owned by Jason, and an Elite Leisure Pools dealer. We build fiberglass, custom gunite, and semi-inground vinyl liner pools in Bixby, Jenks, Glenpool, and across the Tulsa metro.
Section 11-8-8 of the Bixby zoning code limits pools to the rear yard. Any other spot needs a special exception, so we design around that rule.
The same section caps yard fences at 8 feet. A fence that reaches into a required front yard tops out at 4 feet.
Since January 2024, Bixby has taken permits through MyGov. The Bixby permit process wants easements and the footage to each lot line, patios included.
If your neighborhood has an HOA, its review can add weeks. Our 3D design gives the board a clear picture of the finished pool.
Our guide to metro pool permits compares Bixby with the cities around it.
Three Tulsa families, a short drive north of Bixby, on building with Jason.
Jason with Silverado Rock Outdoor Living is absolutely the best! He makes sure everything is done right and is in control of the job from start to finish. He makes sure you as a home owner understand everything and every step. We are so happy and grateful that we found him to do our back yard oasis. Thank you Jason for everything!
Jason and his crew were a pleasure to work with! The design was beautiful and well thought out. Construction went smoothly. Any issues were resolved promptly and communication from start to finish was smooth. We are very pleased with the end result!
The overall knowledge and experience Jason has of pools far exceeds anyone else I have talked to in the pool business. He came out and went through the whole process with me. The crews paid a lot of attention to all small details. I'm extremely happy with my pool as well as my design and overall layout.
All three come from verified Google reviews. You can read our reviews there too.
It is 8 p.m. on a June night. The kids are tired from the water, the dishes can wait, and you are on the step with your feet in the pool.
Hoping to swim by Memorial Day 2027? Fiberglass needs a signed contract by February 15, and vinyl liner by February 22. A gunite pool for the Fourth of July needs one by December 4.
